Is the grid tie backup PS1 system a stand alone, need no more, do all system - charging, selling power, system monitor, etc? Of course voltage in is required (I'm that much of a newbie). Can any battery system (size/type) be used? In the event of total grid loss will the batteries continue to be charged and available for daily use?
I have a very modest, total electric, two bedroom home. No heat, no cooling. My electric consumption is small - 150kw/month but I'm on an island dependent on oil shipped in to generate power. It's not forever.
I've read the Outback info pages and been reading the posts here for quite some time and still not sure how to proceed. Or should I just bite the bullet and contact a local 'expert'? Can I just call Outback and say "Hey, design me a system to do this."?
Oh yeah. Sorry but this probably doesn't belong in this group but I don't understand why a load dump is needed. Doesn't the charge controller handle this? Will my panels crap out because there is no place to put the excess power generated?
PS1-3000 Questions
Moderators: OutBack Moderator Team, OutBack
-
Martin
- Forum Guru
- Posts: 257
- Joined: Tue Dec 13, 2005 3:16 pm
- Location: Somewhere in the hills above Silicon Valley
The PS1 is pretty much a self-contained 120v system for light usage such as yours. If you want 240v capability you'll want to also get an X-240 to bump up the voltage for those loads. You would need to use at least a 100 Ah battery as per Outback recommendations - and if your daily usage averages 5 kWh, then you'd want a battery bank of approximately 625 Ah to give you three full days of power in the event of grid outage (assuming 50% battery depth of discharge and negligible sun during that time). You could go with much less than that if you don't lose power often, or if power always comes back quickly. Also, if you still do have sun when the grid goes down, the system will continue to charge the batteries when the grid is down.
A dump load is a good idea if your grid is down, you have excess charging capability, and you have a good use for the dump load power (for example a water heater). That way you're not wasting the excess energy. The MX-60 will stop charging your batteries when the voltage gets high enough, so you don't technically need the dump load, but it is a good thing to have nonetheless. Also, for some panels especially, it's not a great idea to leave the panels in full sun without a load for long periods of time.
While you'll get good info here and from Outback, your best bet is to contact a pro to do the job unless you're really experienced with electrical jobs (and the codes). It's real easy to do things that aren't up to code if you aren't familiar with them, and inspection time isn't a good time to find out that you need to make changes. This is especially true if your local utility and building department aren't totally familiar with RE systems - it's much easier to have the pro deal with them and educate them.
A dump load is a good idea if your grid is down, you have excess charging capability, and you have a good use for the dump load power (for example a water heater). That way you're not wasting the excess energy. The MX-60 will stop charging your batteries when the voltage gets high enough, so you don't technically need the dump load, but it is a good thing to have nonetheless. Also, for some panels especially, it's not a great idea to leave the panels in full sun without a load for long periods of time.
While you'll get good info here and from Outback, your best bet is to contact a pro to do the job unless you're really experienced with electrical jobs (and the codes). It's real easy to do things that aren't up to code if you aren't familiar with them, and inspection time isn't a good time to find out that you need to make changes. This is especially true if your local utility and building department aren't totally familiar with RE systems - it's much easier to have the pro deal with them and educate them.
Quad-stack GVFX3648, 6.4 kW Solar, 1 kW continuous hydro, 1690 amp-hour 48v Solar-One battery bank.
Aloha,
a few ??s for PS-1 3000 system, x4 Concord AMG 12v batteries, PS-1 48v battery cabinet, Kyocera KC130GT panels, rooftop installation, AL service cable DC run of about 80 feet between PS-1 and Panels string combiner/breaker/disconnect box
Kauai - very sunny West side location
?1- strings of 4 or 5 KC130GTs?
read that to get complete charge want to be sure panels put out at least 48v + 2v (line drop) + 2v(charger) + 4x (15.5-12) battery charge voltage
= about 64V
Any less and the batteries won't 'top off'
btw, strings of 4 are easier for my roof layout...
?2- any step by step turn on sequence for the PS-1 as shipped? not the MX-60 docs - they are set to 12v battery system (I read) ...
?3- What is the default setup on the MX-60 when shipped as part of a PS-1?
Any mods to the default you recomend per my described system?
?4- any problems adding newer batteries (a few years newer) if they are the same model?
Thanks - Randy
a few ??s for PS-1 3000 system, x4 Concord AMG 12v batteries, PS-1 48v battery cabinet, Kyocera KC130GT panels, rooftop installation, AL service cable DC run of about 80 feet between PS-1 and Panels string combiner/breaker/disconnect box
Kauai - very sunny West side location
?1- strings of 4 or 5 KC130GTs?
read that to get complete charge want to be sure panels put out at least 48v + 2v (line drop) + 2v(charger) + 4x (15.5-12) battery charge voltage
= about 64V
Any less and the batteries won't 'top off'
btw, strings of 4 are easier for my roof layout...
?2- any step by step turn on sequence for the PS-1 as shipped? not the MX-60 docs - they are set to 12v battery system (I read) ...
?3- What is the default setup on the MX-60 when shipped as part of a PS-1?
Any mods to the default you recomend per my described system?
?4- any problems adding newer batteries (a few years newer) if they are the same model?
Thanks - Randy
-
jacksonwang
- Forum Junior Member
- Posts: 2
- Joined: Tue Oct 29, 2024 2:51 am
Re:
Hi Randy,indatube wrote: ↑Tue Aug 21, 2007 2:43 amAloha,
a few ??s for PS-1 3000 system, x4 Concord AMG 12v batteries, PS-1 48v battery cabinet, Kyocera KC130GT panels, rooftop installation, AL service cable DC run of about 80 feet between PS-1 and Panels string combiner/breaker/disconnect box
Kauai - very sunny West side location
?1- strings of 4 or 5 KC130GTs?
read that to get complete charge want to be sure panels put out at least 48v + 2v (line drop) + 2v(charger) + 4x (15.5-12) battery charge voltage
= about 64V
Any less and the batteries won't 'top off'
btw, strings of 4 are easier for my roof layout...
?2- any step by step turn on sequence for the PS-1 as shipped? not the MX-60 docs - they are set to 12v battery system (I read) ...
?3- What is the default setup on the MX-60 when shipped as part of a PS-1?
Any mods to the default you recomend per my described system?
?4- any problems adding newer batteries (a few years newer) if they are the same model?
Thanks - Randy
Number of panels: Strings of 4 KC130GT panels are a good choice to match your roof layout. Make sure the total output voltage is around 64V as you calculated to fully charge the battery.
PS-1 Start-up Procedure: Typically, you should connect all the devices first, then power on the controller. Please refer to the specific instructions from the manufacturer to ensure the correct procedure.
MX-60 Default Settings: When the MX-60 is shipped from the factory, it is usually set up for a 12V system. You will need to adjust the settings to match your 48V system.
Adding new batteries: Adding new batteries of the same type but manufactured later is still possible, but make sure they are of the same specifications and capacity to avoid performance issues.
Hope this information helps!