Float coordination - Issues

Discussion about the FM100 AFCI Charge Controller
Lara2023
Forum Expert
Posts: 58
Joined: Sat Aug 05, 2023 5:48 pm
My RE system: Hawker Batteries 4 (6-85-33) total 3380ah, 12k watt panels with 4 outback charge controllers FM-100's, Mate 3s and HUB

Re: Float coordination - Issues

Post by Lara2023 » Mon Mar 31, 2025 2:41 pm

Ok got it, thank you for the clarification!

Lara2023
Forum Expert
Posts: 58
Joined: Sat Aug 05, 2023 5:48 pm
My RE system: Hawker Batteries 4 (6-85-33) total 3380ah, 12k watt panels with 4 outback charge controllers FM-100's, Mate 3s and HUB

Re: Float coordination - Issues

Post by Lara2023 » Tue Apr 01, 2025 2:10 pm

Sorry but I wanted to follow up with a question. I already have a large shunt and all negatives go there. The shunt is from an older monitoring system and not sure if this would be compatible. All negatives go through there. So the connection from the FN-DC would have a connection to the battery + and - terminals and 2 sensor wires to the shunt? Maybe I'm not getting this correct. Sorry!

raysun
Forum Overlord
Posts: 13666
Joined: Tue Jul 26, 2016 5:57 am
My RE system: (Former system. Now retired.)
Flexpower Two: (2) FXR3048A-01 - Series Stacked, (2) FM80, MATE3s, FlexNetDC
6 SimpliPhi 3.8-48 (48v @ 75AH. 450AH total)
Outback IBR3 battery enclosure
REC Alpha 440W panels - 2 arrays: each of 4 strings of 2 in series
2 Midnite Solar MNPV6 combiners w/20A DC disconnects.
Honda EU7000is gas fuel generator
Off-Grid

Re: Float coordination - Issues

Post by raysun » Tue Apr 01, 2025 5:07 pm

Lara2023 wrote: ↑
Tue Apr 01, 2025 2:10 pm
Sorry but I wanted to follow up with a question. I already have a large shunt and all negatives go there. The shunt is from an older monitoring system and not sure if this would be compatible. All negatives go through there. So the connection from the FN-DC would have a connection to the battery + and - terminals and 2 sensor wires to the shunt? Maybe I'm not getting this correct. Sorry!
It may or may not be compatible with the 500A/50mV OB shunt. Nonetheless:
I already have a large shunt and all negatives go there. The shunt is from an older monitoring system
Probably just leave it in place, the old shunt and feed is your battery negative bus. If it was deployed correctly, the same rules apply: "Battery" side of the shunt is the only connection to the Battery Main Negative terminal. The "Load" side is connected to all Device Bat (-) leads.
Check all connections and torque if necessary.
The shunt itself is a conductor that can carry very high amperage. It can be thought of as a high current feed for the Outback shunt.
The OB Shunt can be installed between the old shunt and the battery. Shut down the system and disconnect Main Battery. Remove Main Battery Minus Cable at Battery Main Negative terminal, remove the other end of the battery cable from Old Shunt "Battery" terminal. Install an interconnect cable from Old Shunt "Battery" terminal to OB Shunt "Load" terminal, connect the Main Battery Negative cable to the OB Shunt "Battery" terminal. (Don't get those two backwards.)
Reconnect the Main Battery Negative.
Connect b+ and shunt sense wires per instruction sheet.
Reconnect battery and start system.

Interconnect cable:
Measure the diameter of Old Shunt battery terminal and the OB shunt terminals (5/16" or 3/8" for OB, I think.)
Battery Cables USA is a great place to get the interconnect cable made. Fast, high quality, reasonably priced, shipping USPS Priority for $3.97.

Measure distance from Old Shunt to OB Shunt (try for 12 - 18") and have the cable constructed from 4/0 (0000) AWG cable, black jacket, with ring terminals matching the shunts terminals.
https://www.batterycablesusa.com/0000-g ... -with-ends

Lara2023
Forum Expert
Posts: 58
Joined: Sat Aug 05, 2023 5:48 pm
My RE system: Hawker Batteries 4 (6-85-33) total 3380ah, 12k watt panels with 4 outback charge controllers FM-100's, Mate 3s and HUB

Re: Float coordination - Issues

Post by Lara2023 » Tue May 13, 2025 6:28 am

Thank you so much

Post Reply