So I have been researching replacing my old FLA batteries with new lithium batteries. I decided to check them out by researching the Googleverse, manufacturer websites and then the Youtube. Interestingly enough, I came across a youtube video showing installation of the Homegrid stack. I like this solution due to flexibility and expansion. During this video, it was mentioned that in California the stack is limited to 4 batteries, not the 8 batteries which is the capacity of the design. I'm thinking WTF? They didn't say why this was the case. But my research turned up the answer. And the answer results in increased cost to the end user, as is always the case. I searched this forum and found mention of UL9540. But there is no mention of UL9540A and no mention of NFPA 855.
So before you plan a system or hire a company, it would behoove the property owner to familiarize themselves with these regulations. The reasoning may be for permit approval, insurance coverage, fire prevention and reduction in liability claims in case of injuries from the install. When you sign your contract for your system, the company you hire should perform work to these specifications at a minimum and their work should pass inspection. If they will not agree to this in the contract, you may want to take your money elsewhere. Now that I think I understand these regs, I can plan out the modifications to my systems and decide if they are feasible due to costs or just let my utility handle it all for me and go the generator route. Then it becomes a matter of finding a contractor willing to perform to the regs.
UL 9540 UL9540A NFPA 855
-
pss
- Forum Emperor
- Posts: 1325
- Joined: Mon Jul 24, 2017 8:40 am
- My RE system: 8330 watts in three strings, Flexmax 60 x 3, Radian 8048A, GSLC load center, Mate 3S, Hub 10.3, FN-DC and 900 Amp, 48V Trojan T105-RE battery bank.
Re: UL 9540 UL9540A NFPA 855
It is up to the property owner to become aware of local codes that will need to be met to pass inspection. This includes all construction and electrical codes.
NFPA 855 is pretty much changing all the time due to technological battery advances limiting the incidence of battery fire as well as run away fires. So it may not even come into play.
However. It is important to get an inverter that is UL9450 and is matched to a battery system that is UL9450A when connected to the inverter. This reduces fire risk to the maximum at this point in time.
Solar panel rapid shutdown is also required for roof mount panels.
So, before you sign or build system, educate yourself.
NFPA 855 is pretty much changing all the time due to technological battery advances limiting the incidence of battery fire as well as run away fires. So it may not even come into play.
However. It is important to get an inverter that is UL9450 and is matched to a battery system that is UL9450A when connected to the inverter. This reduces fire risk to the maximum at this point in time.
Solar panel rapid shutdown is also required for roof mount panels.
So, before you sign or build system, educate yourself.