Auto Charge Termination Control ends the Absorb phase when charging targets are met.
According to the Fortress manual "Terminate when charge current drops below
0.05C".
Set the ACTC parameters In the FNDC / Battery Charging menu:
Charged Voltage: 0.4V below the lowest Absorb Voltage used on the chargers in the system.
Charged Time: 1 minute
Charged Return Amps: 5% of the (C20) Battery Capacity.
Fortress Power eVault Max
-
raysun
- Forum Overlord
- Posts: 13673
- Joined: Tue Jul 26, 2016 5:57 am
- My RE system: (Former system. Now retired.)
Flexpower Two: (2) FXR3048A-01 - Series Stacked, (2) FM80, MATE3s, FlexNetDC
6 SimpliPhi 3.8-48 (48v @ 75AH. 450AH total)
Outback IBR3 battery enclosure
REC Alpha 440W panels - 2 arrays: each of 4 strings of 2 in series
2 Midnite Solar MNPV6 combiners w/20A DC disconnects.
Honda EU7000is gas fuel generator
Off-Grid